Two of our projects, told in detail with real client reviews. More are added as clients share photos and details with us.
Rates updated September 2026. All rates below are A+ category, per square foot, for slab measurement.
Slab measurement only. Rate applies within Lahore city.
We provide our services within Lahore city.
Best-grade material used throughout.
• The exact rate is quoted after seeing your house's working drawings and structural drawings; the figures above are approximate, standard-plan rates for grey structure work within Lahore city.
• Grey structure is typically completed in 3 to 4 months. There are no extra charges for outside or boundary wall work, it's included in the same A+ construction quality.
The cost of a grey structure varies with the specifics of your plot and design. The rates above are based on a standard construction plan, which assumes:
• The plot does not have excessive depth, which would otherwise require additional excavation and foundation work.
• The foundation is standard, without the need for deep piling or raft foundations.
• The walls on the first floor align with the ground floor; otherwise, extra beams and columns are required, increasing material and labor costs.
• The structure follows a basic architectural design without excessive cantilevers or unsupported spans that would require additional reinforcement.
Weak soil needs a stronger foundation, such as raft or pile foundations, which raises costs. Hard or rocky soil increases excavation costs.
More steel and concrete are needed for seismic resistance or heavy loads, and misaligned floors require extra beams and columns.
Brick grade (Class-A vs. standard), cement and steel quality, and using premium crush and sand (such as Margalla crush) all affect the final cost.
A standard ceiling is 10 feet; going higher, or using a thicker roof slab with extra reinforcement, adds to material usage and cost.
Large open spans need extra beams and columns, and cantilevered terraces or balconies need additional steel and concrete reinforcement.
Basements or underground water tanks need waterproofing, and thermal or heat-resistant roof treatments add to the budget.
Each additional floor needs a stronger foundation and more reinforcement lower down, along with more steel, concrete, and labor overall.
Real reviews from three more completed projects, full case studies for these are being built out.
"Very good work, I built my 10 Marla house in Bahria Town, really very good work. They've worked in Bahria Town and other societies for almost 17 years."
"Really good experience, I built my 5 Marla house in Lake City and it was completed within 6 months."
"Highly recommended construction company in Lahore. We recently completed our 5 Marla house in Bahria Town Lahore with MS Construction, as an overseas Pakistani, their care and communication meant a lot."
Book a free site visit and get a fixed, itemized quote within 24 hours, locked for 30 days.